1.
General |
: |
Three
wheels mounted with toeing system. On pneumatic tyre wheel
system which is suitable for tractor/jeep/pick-up toeing.
Small wheel in the front is used for long halt and manual
toeing during work. |
2.
Tank |
: |
Main
body of the tank made by two part of reinforced MS Sheet.
Inside and outside of the heating chamber is of made by
1/8 inch thick MS Sheet. Outside cover sheet for insulation
is made with 16 BSW MS Sheet. Outer heat chamber is insulated
by 1 inch thick glass wool to reduce the heat transfer.
Between two parts there are fins for inside the interior
chamber. 1/4 inch thick extra MS Plate fixed at the bottom
which can be changed after a long period of use to protect
the broken of the inside chamber from corrosion. Extra plate
can be changed when required. |
3.
Heating |
: |
Burning
system is by tube burner with LP Gas and pressure regulator
for efficient burning. Tube burners are fixed at the bottom
of burning chamber. Inside the heating chamber the bitumen
drums are heated by the exhaust gas for quick melting of
the drum for high productivity. Two drums of bitumen can
be melted within one and half hours heating. Kerosene burners
system can be attached on request. The circulating exhaust
gas is being dispatch by a chimney on the top of the boiler. |
4.
Chassis |
: |
Both
rear wheels (6.00-12) are mounted on a 4”x2”x2”
MS channel. Pneumatic tyre wheels are fitted without mud
guard. Front wheel is provided for resting and easy to manual
toeing. This unit can be toed by vehicle or manually.. |
5.
Loading |
: |
The drum can be loaded manually into a horizontal chamber. The loaded drum can be pulled up on the heating position by 1 inch dia rope and inclined ladder manually. After melting and discharge the empty drum can be taken out by hand |
6.
Delivery |
: |
Melted
Bitumen can be poured at the end of the rear side of the
boiler by a 2 inch dia gate valve. A thermometer of 00-300 deg. C
is fixed by the side of the delivery port to measure the
pouring temperature of bitumen. |
7.
Painting |
: |
Bitumen
Tar Boiler is painted black by heat and chemicals resistant
paint. Night reflectors signs has been fitted for movement
of the boiler at night. |
8.
Hand Tools |
: |
For
the running maintenance necessary hand tools are included. |